Our services
If you have chosen a project or have a project with a building permit, but want a warm and easy-to-build house, our team of architects and designers will adapt your project to construction from SIP panels. The work takes 2 to 4 weeks, the exact deadline depends on the complexity of the house. We can offer small changes (change the distances between windows, doors, etc.) to use SIP panels more rationally and save on the cost of materials.
You provide us with drawings in a workable format (DWG);
We make adaptations, if necessary, discuss construction solutions with you.
Once the decisions are approved, we prepare all the drawings and material specifications.
Contact now and get an offer
Verkių g. 30B, LT-08221,
Vilnius, Lietuva.
E. info@sipprojektai.lt
T. +370 699 49 222